It was another perfectly gorgeous winter day yesterday (except for that whole lack of rain bit), and the entire Tack Fence crew came out for the big job - setting the main gate and surrounding wrought-iron panel posts.  Craig and Jeremy 1 finalized the layout and spacing, and John, Dave and Jeremy 2 spent the entire day digging and measuring and digging some more before meticulously plumbing and concreting the posts, including the two 10' monster gate posts.
 
Now, Craig will start building the custom single swing 16' entry gate, the guys will be back today or Monday to install the wrought iron panels and the small man gate, and the front fencing project will be 99% complete!
 